Header Ads

Crude oil price and Sangu Platform as Storage facility


"My publication: Crude oil price create maximum utilization scope"

(Article Published on 17 May' 2017)

No scope of increasing international crude oil price within the next 5years and it will be within the bench mark of US$45-60/barrel as because the oil production is still surplus in OPEC and other oil exporting countries.

Click here for details

Sangu Platform 

Bangladesh is one of the oil importing country but do not have much facility like oil storage, refinery and proper distribution & marketing policy. In one of my article published (April'2020) in The Daily Star mentioned few proposals on unrefined or refined oil storage and supply procedure inside country. It could also be the cost saving long-term business policy. 

Mention below part of article.  

a) Sangu platform was build for offshore drilling and gas supply from offshore to national grid in Chittagong, Bangladesh. This platform is holding connection of 10-12 wells of Sangu gas field, so far the depth of each well is around 3500m. Sangu gas field is abandoned and all the wells are sealed. Sangu platform connected with production pipeline to Chittagong port that can be 20-22km long. This 10-12 wells of Sangu field and 20-22km long pipeline could be storage tank for imported crude oil.

Additionally need to do some rejuvenate work at Sangu platform for oil career ship to make the platform suitable for uploading crude oil from ship to this empty well/pipeline for storing large volume of oil and later on pump this crude oil to Chittagong oil refinery for further processing. It may reduce oil career cost by saving time, quick unload & avoid port arrangement.

Before that Bangladesh Petroleum Corporation (BPC) & BAPEX jointly can do a feasibility study of this platform and connected wells whether is it viable for storing oil or not. The feasibility study may include the present status of platform & supply pipeline,  hole cleaning, set packer at bottom of hole and pressure test of well for finding leak, pressure test of pipeline to Chittagong from Sangu platform. Finally calculate inside capacity of this 10-12 wells and 20-22km long pipeline.


No comments

Theme images by Michael Elkan. Powered by Blogger.